昌马水库发电、排沙隧洞全断面混凝土衬砌施工

Full-section Concrete Lining Construction of Power Generation Tunnel and Flushing Tunnel of Changma Reservoir
下载PDF
导出
摘要 昌马水库引水、排沙压力隧洞混凝土衬砌采用全断面衬砌钢模台车施工,满足了整体支模、混凝土浇筑作业、出渣通行三个方面的要求。在保证工期和衬砌高质量的前提下取得了较好的经济效益,施工技术先进、合理,应用范围较广。 The concrete lining of water diversion and flushing pressure tunnel of Changma reservoir adopts the full-section lining steel trolley, which satisfies the integral support mold, the concrete pouring work and slag disposal passage. A better economic benefit has gained under the conditions of guaranteeing realization of construction period and high quality of lining. Such construction technique is advanced and rational and its application scope is wide.
作者 张成明
出处 《水力发电》 北大核心 2006年第2期36-38,共3页 Water Power
关键词 隧洞 全断面衬砌 钢模台车 昌马水库 tunnel full-section lining, steel trolley Changma reservoir
  • 相关文献

参考文献2

二级参考文献5

  • 1唐怀吉,薛平云.甘露醇治疗脑出血致肾衰[J]中国危重病急救医学,1993(03).
  • 2王健.甘露醇中毒引起的急性肾衰[J]国外医学泌尿系统分册,1990(02).
  • 3李嘉,刘炳书.静脉输注甘露醇导致急性肾功能衰竭4例报告[J]临床医学杂志,1989(05).
  • 4张本立,陈泳莲.高渗性肾病(附3例报告)[J]解放军医学杂志,1987(04).
  • 5刘杜鹃,宋利华.药物因静脉注射过速而写引起的不良反应[J]中国医院药学杂志,1986(08).

共引文献55

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部