摘要
为了有效控制水库泥沙淤积的数量,改善库区泥沙淤积的形态,从而延长水库的使用寿命,小浪底水库于2004年首次进行了人工扰动塑造异重流试验。结果表明:异重流冲沙前后库尾泥沙淤积形态和数量的变化明显,认为利用人工塑造异重流进行水库冲沙是可行的。
In order to control the sedimentation amount in the reservoir and improve sedimentation topography, which was also to maintain the normal operation life of the Reservoir, the first manual sediment disturbance test, as made density curren in Xiaolangdi Reservoir in the year of 2004. the primary conclusions are as follows: before and after this manual density curren, through comparing and analyzing the change of the sedimentation topography and amount in the backwater end, the desihing is feasibility by using manual density current in Xiaolangdi reservoir.
出处
《水力发电》
北大核心
2006年第2期61-62,共2页
Water Power
关键词
异重流
人工扰动
冲沙
泥沙淤积
小浪底水库
density current
manual sediment disturbance
desilting
sedimentation
Xiaolangdi reservoir