摘要
本文对遂渝(铁路)线无碴轨道综合试验段首次采用的用于控制地基沉降的路基工程措施——(DK132+486 ̄+611)桩板结构的设计构造与施工控制作了简要介绍,重点阐述了施工程序、施工方法,并对检测、监测的情况作了说明。
this article introduces chiefly the design and construction of pile slab structure which was adopted firstly to control the settlement of the subgrade- (DK132+486-+611)in SuiYu railway, end focuses on the construction procedure, construction technology and the testing and monitoring.
出处
《重庆建筑》
2006年第3期48-51,共4页
Chongqing Architecture
关键词
桩板结构
构造
施工
检测与监测
pile slab structure
structure
construction
testing and monitoring