基础设施BOT项目的产品价格调整机制研究 被引量:24

Research on Price Adjustment Mechanism for Infrastructure BOT Projects' Products
下载PDF
导出
摘要 基础设施BOT项目普遍都有较长的特许权期,项目的外部经济环境在这一过程中必将发生各种各样的变化,而项目公司一般都没有自主的价格调整权力以适应这种变化。通过设计一个限制性的价格调整机制来解决这一矛盾,这一机制允许项目公司在政府限定的次数和幅度内进行价格调整,增强了项目公司对经济环境变化的适应能力和投资BOT项目的积极性,同时政府也能限制价格调整对国民经济运行的影响。 Build Operate Transfer (BOT) projects generally have long concession term, various changes of external economy environment will take place in this course, The project companies generally all haven't independent price adjustment right to adapt this kind of changes, Solving this contradiction through designing a restricted price adjustment mechanism, this mechanism allows the project company to carry on price adjustment without exceeding the number of times and range that the government limited. This mechanism also strengthens the project company's adaptive capacity to the economic environment changes and improves its enthusiasm of investing in BOT projects. At the same time, the government also can control the price adjustment's impact on national economic development.
出处 《预测》 CSSCI 2006年第2期74-77,共4页 Forecasting
基金 国家自然科学基金资助项目(70371045)
关键词 BOT 价格调整机制 项目公司 BOT price adjustment mechanism project company
  • 相关文献

参考文献10

  • 1Nisangul C.Private participation in infrastruc-ture:a risk analysis of long term contracts in power sector[D].George Mason University,2002.1-5.
  • 2杨宏伟,何建敏,周晶.在BOT模式下收费道路定价和投资的博弈决策模型[J].中国管理科学,2003,11(2):30-33. 被引量:30
  • 3Wang S Q,Tiong R L K.Case study of government initiatives for PRC's BOT power plant project[J].International Journal of Project Man-agement,2000,18(1):69-78.
  • 4金永祥,童玫.BOT项目讲座(十) 价格项目重要的商务条件[J].中国投资(中英文),2002(11):90-91. 被引量:6
  • 5储祥银,万颖.利用BOT方式融资 加快基础设施建设[J].国际经济合作,1998(12):4-8. 被引量:4
  • 6Min C L.Contract design of private infrastruct-ure concessions[D].University of California,Berkeley,2000.114-126.
  • 7Tam C M.Build-Operate-Transfer model for infrastructure developments in Asia:reasons for successes and failures[J].International Journal of Project Management,1999,17(6):377-382.
  • 8Felipe V,Stephen A.Private sector participate on in the delivery of highway infrastructure in Central America and Mexico[J].Construction Management and Economics,2004,22:745-754.
  • 9Yeo K T,Tiong R L K.Positive management of differences for risk reduction in BOT projects[J].International Journal of Project Management,2000,18(4):257-265.
  • 10John E S,Isr W.Alternate financing strategies for Build Operate Transfer projects[J].Journal of Construction Engineering and Management,2003,129(2):205-213.

二级参考文献4

  • 1Mills, G. Welfare and profit divergence for a tolled link in a road network[J]. Journal of Transport Economics and Policy. 1995,29 : 137 - 146.
  • 2Verhoef, E. The Economics of Regulating Road Transport[M]. Edwars elgar,Brokfield, 1996.
  • 3Yang H, Meng Q. Highway pricing and capacity choice in a road network under a build-operate-transfer scheme [J ].Transportation Research, 34A, 2000,207 - 222.
  • 4Louie Nan Liu, John F. McDonald. Economic efficiency of second-best congestion pricing schemes in urban highway systems[J]. 33B, 1999,157- 188.

共引文献36

同被引文献271

引证文献24

二级引证文献156

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部