摘要
在地质条件极其复杂的狭窄场地中,采用岩石锚(杆)桩基础作为83m高的巨塔基础,不仅很好地满足了工程要求,而且节约了大量钢筋混凝土,缩短了工期,较常规设计显示了优越性。
This paper describes an example of successful application of anchor (rod) pile in the foundation design of a 83m high huge tower within a narrow space of complicated geological condition. This application has been, up to date, a successful beginning domestically.
出处
《工业建筑》
CSCD
北大核心
1996年第6期39-43,共5页
Industrial Construction
关键词
高耸构筑物
塔
锚杆
粘结强度
基础设计
anchor (rod) pile
pulling
resistance
coefficient
bonding strength
test pile