摘要
三峡电站水轮机额定出力710MW,与世界上已投运的最大容量和尺寸的混流式水轮机相当。由于三峡电站水头变化范围起出了混流式水轮机常规的适应范围,故三峡水轮机的稳定性引起了国内外同行们的普遍关注。本文结合三峡特定的运行条件,提出了改善三峡水轮机稳定性的综合治理措施,并对各种技术措施进行了分析。
During TGP phase-1 construction, new approaches and hi-tech were employed by Gezhouba Group Corporation in such areas as tunneling, blasting, underwater dredging, cut - off wall construction, RCC construction and formwork techniques, which demonstrated the technical characteristics in TGP phase - 1 construction and which promoted technical progresses for construction.
出处
《中国三峡建设》
1996年第6期12-13,共2页
China Three Gorges Construction