摘要
介绍隆林布东水电站引水隧洞在开挖及支护施工过程中,针对隧洞进、出口段的实际情况,结合工程地质条件,采用相应的开挖及支护措施。
In the course of excavation, support and protection construction of diversion tunnel of Budong Hydropower Plant at Longlin county, corresponding excavation, support and protection measures were taken according to the actual conditions of tunnel inlet and outlet sections as well as the engineering geological conditions.
出处
《广西水利水电》
2006年第1期58-60,65,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
引水隧洞
开挖
支护
工程地质
Diversion tunnel
excavation
support and protection
engineering geology