大朝山水电站的工程地质勘察,是在现场山高坡陡、交通不便、勘探设备和生活用品均靠人背马驮的艰难条件下开展的.工作中抓主要工程地质问题,紧密围绕设计方案,合理布置和综合应用勘探试验手段,按程序、分步骤严格管理,逐步深入,终于取得了周期短、工作量省、质量优的显著成绩。
The engineering geologic investigation of Dachaoshan Hydropower Station was caacced out under the circumstances as high mountains,steep slopes,poor transport facilities in-situ. Equipment and articles for daily use had to be carried on human and horse backs. Concentrating on crucial points of engineering geology, proper arrangement and combined exploration tests were made around the design scheme closely. Work on the investigation progressed gradually according to the procedure and strictly controlled step by step. Finally, excellent results were achieved with short action cycle,economical work load and good quality.