本文对大朝山水电站枢纽区工程地质条件作了简要说明,并论述了坝址、坝型、坝线及地下厂房位置选取时工程地质条件的分析比较.
Brief exposition is given about the engineering geological conditions within the hydrojunction of Dachaoshan Hydropower Station. Analysis and comparisions of these conditions were made for location selections of damsites,typed of dam and underground powerhouse.
出处
《云南水力发电》
1996年第2期23-28,共6页
Yunnan Water Power
关键词
水电站
工程地质勘察
初步设计
Dachaoshan Hydropower Station,engineering geology,reconnaissance, preliminary design stage