摘要
大朝山电站那戈河人工砂石料系统工程建设、运行、管理工作由水电八局承担,于1994年2月12日进场开工,工程于1996年5月投入系统试运行.本文介绍那戈河人工砂石料系统工程的设计优化及施工的经验.
Costruction,operation and managemnt of Nagehe River manual aggregate processing system at Dachaoshan Hydropower Station is undertaked by China Water Conservancy and Hydropower Engineering Bureau 8. Work on it began on Feb. 12th of 1994 and commisioned in May of 1996.The optimized design and construction experience of this system are described as follows.
出处
《云南水力发电》
1996年第2期73-76,共4页
Yunnan Water Power
关键词
水电站
人工砂石料
设计
工程施工
Dachaoshan Hydropower Station, manual aggregate processing system, design,construction