大伙房水库输水工程隧洞地质条件综述 被引量:2

Summary on geological condition of water conveyance project of Dahuofang Reservoir
下载PDF
导出
摘要 主要针对大伙房水库输水工程,根据其设计阶段的地质勘察成果,同时结合施工中已开挖揭露的实际地质情况,对地形地貌、区域构造稳定性、地层岩性、地质构造、水文地质条件、主要工程地质问题等进行了综合评述,以期关心本工程的人士能对隧洞的工程地质条件有初步了解和认识。 So far as the water conveyance project of Dahuofang Reservoir is concerned, a summary is made herein on the topography, geomorphy, regional structureal stability, stratigraphic lithology, geological formation, hydrogeological condition and the main engineering geological problems based on the geological investigation achievements got from the design phase of the project in combination of the actual geological condition revealed during the excavation concerned.
出处 《水利水电技术》 CSCD 北大核心 2006年第3期36-38,共3页 Water Resources and Hydropower Engineering
关键词 大伙房水库输水工程 输水隧洞 地质条件 区域工程地质 综述 water conveyance project of Dabuofang Reservoir water delivery tunnel geological condion regional engineering geology summary
  • 相关文献

参考文献7

二级参考文献3

共引文献221

同被引文献6

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部