摘要
结合断桩工程实际,介绍了一种采用钢筋混凝土沉井基础作为外壁再进行灌注混凝土的断桩处理方法,承载力经验算满足设计要求。实践证明,该方法切实可行,效果显著,值得推广。
According to the pile-breakage engineering practice, points out the method of using steel concrete immersion base for out-wall which is used to deal with pile-breakage, then pouring out concrete, the calculation of bearing capacity is request of design. The practice is proved, the result of method is obvious and surely workable.
出处
《山西建筑》
2006年第5期84-85,共2页
Shanxi Architecture
关键词
钻孔灌注桩
断桩
沉井基础
承载力
bored pile, pile-breakage, immersion base, bearing capacity