摘要
根据安徽黄山太平湖大桥的实际工程,介绍了钢拱肋的两种安装方案,即单肋起吊和双肋整体起吊,并分别进行了分析评价,比选出施工所采用的合理方案。
Combined with practical work of Huangshan Taiping Lake Bridge in Anhui province two installation methods of steel arch rib: single arch rib lifting and double arch ribs lifting are introduced. Based upon comparison reasonable scheme is selected for construction.
出处
《山西建筑》
2006年第5期263-264,共2页
Shanxi Architecture
关键词
安装方案
钢拱肋
吊装施工
installation scheme, steel arch rib, lifting construction