对分宜发电有限责任公司100MW循环流化床锅炉的运行状况进行了介绍。重点对风烟系统、给煤及燃烧系统、汽水系统、排渣系统、耐磨耐火材料等在运行中出现的问题及解决措施进行了介绍。
This article introduces 100 MW CFB boiler operation in Fenyi Power Plant. Existing problems on air gas system, fuel feeding and burning system, steam - water system, slag system and refractory material are anphasized, and measures to solve them are presented as well.