摘要
从大体积混凝土施工特点出发,结合工程实例,分析了温度测控的方法、工艺,根据测控结果采取相应措施,有效地防止大体积混凝土温度裂缝,提出了温度监测中的注意事项。
combined with the construction features of mass concrete and practical work the temperature measurement and control methods are analyzed. According measurement results corresponding measures are adopted, which effectively prevent temperature cracks in mass concrete. In the end matters deserving attention in measurement process are proposed.
出处
《山西建筑》
2006年第7期131-132,共2页
Shanxi Architecture
关键词
温度测控
拆模时间
大体积混凝土
temperature measurement and control, stripping time, mass concrete