期刊文献+

电磁波随钻测量与欠平衡钻井 被引量:7

Electromagnetic Wave Measurement While Drilling and The Under Balanced Drilling
下载PDF
导出
摘要 欠平衡钻井具有能提高硬地层的机械钻速,减少循环漏失和压差卡钻等优点,在国外已经得到了迅速发展,成为一种趋势,其大量应用也为电磁波随钻测量技术(EM-MWD)的发展提供了更大空间。简要介绍了欠平衡钻井技术及其特征,并对EM-MWD在其中应用的重要性进行了描述,分析了EM-MWD的关键技术,对其研究方向进行了初步探讨。 The under balanced drilling is able to improve the maehinieal drilling rate in forcibly stratum,to reduce circulating mud loss,and to decrease the pressure differece sticking ere. It has been received rapid development and becomes a sort of direction. A great lot application of the drilling aslo provides a great space for electromagnetic wave measurement while drilling, or EM--MWD. The paper briefly intrduces the under balanced drilling and its character,and describes the itnportance of the appli cation of EM-MWD in under L balanced drilling, and analyses the privotal technique of EM-MWD, and primitively discusses the study di reetion for EM-MWD inthe end.
出处 《西部探矿工程》 CAS 2006年第3期198-199,202,共3页 West-China Exploration Engineering
关键词 欠平衡钻井 随钻测量 电磁波随钻测量 电磁波测井 the under balanced drilling measurement While drilling electromagnetic wave measurement while drilling electromagnetic well logging
  • 相关文献

参考文献7

二级参考文献13

  • 1[2]Julian B R,Gubbins D.Three-dimensional seismic ray tracing. J. Geophys,1977,43(1) :95 ~ 114
  • 2[3]Lambare G, Lucio P S, Hanyga A. Two-dimensional multivalued traveltime and amplitude maps by unifprm sampling of a ray field. Geophys.J. Int., 1996,125(2) :584 ~ 598
  • 3[4]Vidale J E. Finite-difference calculation of traveltimes. Bull. Seis.Soc. Am, 1988,78 (6): 2062 ~ 2076
  • 4[5]Vidale J E. Finite-difference calculation of traveltimes in three dimensions. Geophysics, 1990,55(5) :521 ~ 526
  • 5[6]Qin F, Luo Y, Olsen K B, et al. Finite-difference solution of the eikonal equation along expanding wavefronts. Geophysics, 1992, 57(3) :478 ~487
  • 6[7]Zhang Z, Quan Y, Harris J M. Eikonal equation solver in anisotropic media, STP Annual Report, Stanford: Stanford University, 1996
  • 7[8]Nakanishi I, Yamaguchi K. A numerical experiment on nonlinear image reconstruction from first-arrival times for two-dimensional island arc structure. J. Phys. Earth, 1986,34(2): 195 ~ 201
  • 8[9]Moser T J. Shortest path calculation of seismic rays. Geophysics, 1991,56(1) :59 ~ 67
  • 9[11]Cao S, Greenhalgh S. Calculation of the seismic first-break time field and its ray path distribution using a minimum traveltime tree algorithm. Geohys. J. Int, 1993,114(3): 593 ~ 600
  • 10[12]Klimes L, Kvasnicka M. 3-D network ray tracing. Geophys. J. Int.,1994,116(3) :726 ~ 738

共引文献93

同被引文献47

引证文献7

二级引证文献63

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部