摘要
山西省防雷装置设计审核和竣工验收工作与全国发达省份相比,开展比较缓慢,全省各市发展也极不平衡。本文通过对全省此项工作开展情况进行分析,提出了一些促进性的发展意见,仅供参考。
Compared with the developed province of China, the design, auditing and acceptance work of thunder prevention equipment is relatively slow in Shanxi province. And the development is not balanceable over the cities of Shanxi. This paper gave some comments through some discussion on the work over the whole province, just for reference.
出处
《山西气象》
2006年第1期37-39,共3页
Shanxi Meteorological Quarterly
关键词
防雷装置
审核
验收
对策
thunder prevention equipment, audit, check and accept, countermeasure