摘要
为了实现与国际接轨就必须推广采用工程量清单计价模式。本文结合我国现实状况通过新旧对比进行了论述。
It is necessary to widespread and adopting valuate mode of engineering list in consonance with international engineering. This paper states valuate mode of engineering list through the comparison of new hst and old ones combining with our actuality.
出处
《林业科技情报》
2006年第1期26-26,共1页
Forestry Science and Technology Information
关键词
工程量清单
计价模式
招投标
engineering list
valuate mode
competitive - bidding