摘要
牛居油田是受岩性和构造双重因素所控制的多断块,多含油层系的油藏.从1983年底开始投产,初期和中期效果较好.1988年以后,部分油层水淹,从1990年起,油田进入低速开采阶段.近几年,运用了分层注水、间歇注水、油井堵水增排、衰竭采油井等技术,从而控制了含水上升率,减缓了油田产量递减速度.
iuju Oil Field is a reservoir of multi-fault block and multi-oil bearing zones controlled by lithological character and structure. Since it was put into production by the end of 1983,it had turned out high output in the initial and middle stages. However,water flooding took place in part of the oil bearing formation in 1988,then the oil field entered low-speed development stage in 1990. In the recent years,separate layer water injection,intermittent water injection,water shutoff,stimulation of drainage and oil well depleting etc. have been applied in this oil field,the increase of water cut has been controlled and the progressive decreasing of oil production has been retarded.
出处
《西安石油学院学报》
1996年第4期29-34,共6页
Journal of Xi'an Petroleum Institute
关键词
分层注水
牛居油田
高含水期
油层注水
Free Words]: measure,separate layer water injection, water shutoff, depleted well/[intermittent water injection ,stimulation of drainage ]