期刊文献+

基于Stackelberg模型的准时交货激励契约分析 被引量:12

Decision Analysis of Just in time Delivery Incentive Contract Based on Stackelberg Model
原文传递
导出
摘要 以提高采购的准时交货概率为目标,针对准时采购中采购商与供应商之间的动态交互行为,建立了以采购商为主方、供应商为从方的两阶段Stackelberg主从博弈模型,并对模型最优解存在的必要条件进行了形式化数学表达和分析,进而对决策变量间、决策变量与库存成本参数间的交互影响关系进行了理论分析和证明推导.分析结果有助于采购商与供应商制定相应的采购激励策略和供应策略. Just-in-time (JIT) purchasing is an important approach to shorten the response time of supply chain efficiently and implement the agile operation of supply chain. How to quantitatively formulate and analyze the dynamic interactive relation between the strategies of purchaser and supplier is an important base of supply chain coordinated planning and decision-making. On the purpose of increasing the probability of delivery on time, with purchaser as leader and supplier as follower, this paper establishes the two-stage Stackelberg model about dynamic interactive decision-making behaviors between purchaser and supplier. The existence requirement of optimum solution is formulated and analyzed, and the interactive influencing between decision variables of purchaser and supplier and the interactive influencing between decision variables and inventory cost parameters are analyzed and inferred theoretically. The results can help for purchaser and supplier to determine corresponding incentive strategies of purchase and supply respectively.
作者 杨文胜 李莉
出处 《系统工程理论与实践》 EI CSCD 北大核心 2006年第3期17-24,共8页 Systems Engineering-Theory & Practice
基金 南京理工大学经管青年资助基金(JGQN0510)
关键词 采购 准时交货 STACKELBERG模型 响应时间 决策分析 purchasing JIT delivery stackelberg model response time decision analysis
  • 相关文献

参考文献9

  • 1Jahnukainen J,Lahti M.Efficient purchasing in make-to-order supply chains[J].International Journal of Production Economics,1999,59:103-111.
  • 2马士华,王许斌,李延晖,杨文胜,周晓,沈玲.供应链多阶响应周期构成的实例研究[J].计算机集成制造系统-CIMS,2002,8(12):960-964. 被引量:14
  • 3Gelinas R,Jacob R.Just-in-time purchasing and the partnership strategy[J].European Journal of Purchasing and Supply,1996,2(1):39-45.
  • 4Freeland J R.A survey of just-in-time purchasing practices in the united states[J].Production and Inventory Management Journal,1991,32(2):43-49.
  • 5Gunasekaran A.Just-in-time purchasing:An investigation for research and applications[J].International Journal of Production Economics,1999,59:77-84.
  • 6Hill Charles W L,Jones G R.Strategic Management Theory:An Integrated Approach[M].4thed,Houghton Mifflin,New York,1998.
  • 7Iyer A V,Bergen M E.Quick response in manufacturer-retailer channels[J].Management Science,1997,43(4):559-570.
  • 8Grout,John R,Christy,David P.An inventory model of incentives for on-time delivery in just-in-time purchasing contracts[J].Naval Research Logistics,1993,40(4):863-877.
  • 9Chapman S N.Just-in-time supplier inventory:An empirical implementation model[J].International Journal of Production Research,1989,27(12):1993-2007.

二级参考文献1

  • 1863/CIMS课题组.供应链多阶响应周期调查报告[M].武汉:华中科技大学管理学院,2002..

共引文献13

同被引文献125

引证文献12

二级引证文献50

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部