期刊文献+

综采工作面采用聚能管预裂爆破提块研究 被引量:5

STUDY ON UTILIZING THE BINDING ENERGY TUBE BLASTING INCREMENT BLOCK ADVANCE ON CAVING WORKFACE
下载PDF
导出
摘要 本文针对综采工作面采用微差预裂爆破的方法,存在作业时间较长,影响工作面的出煤时间,产量受影响,难以充分发挥爆破提块的优势作用。本文根据聚能管定向控制爆破机理,首次提出采用聚能管对工作面煤层进行预裂爆破,形成长的分布裂缝,在割煤机的扰动下,以提高开采的块率。试验表明,聚能管能够比原先爆破方法提高块率5%,可为矿取得良好的经济效益;同时该技术也是首次应用到综采工作面,丰富了爆破理论。 This article aims at the method which Caving workface utilizing the elemental error blasting crack advance, it causes the work time longer, affect the coal production time on working face, affect the output and difficultly full exerting the superiority function of the blasting increment block. Based on the mechanism of the binding energy tub using the directional control blast, proposing to use the binding energy tube carry on blasting crack in advance to the coal bed of working face for the first time and shaping the distributed crack, under the perturbation of coalcutter, enhancing the block rate of mining is adopted. It is indicated that the binding energy tube could enhance the block rate 5% compared to the original blast method, obtaining a better economic efficiency for the mine; workface and enriches the blast theory. simultaneously the technology is also applied into Caving
出处 《中国矿业》 北大核心 2006年第3期38-40,43,共4页 China Mining Magazine
基金 教育部高等学校优秀青年教师教学科研奖励计划基金(2000-91)
关键词 条综采工作面 聚能管 预裂爆破 爆破提块 Caving Workface Binding Energy Tube Blasting crack advance Blasting increment block
  • 相关文献

参考文献5

二级参考文献6

  • 1杨永琦,张奇,于慕松,李彦涛,陶龙光.定向控制断裂爆破技术的研究[J].煤炭学报,1996,21(3):283-286. 被引量:13
  • 2励争.动态焦散线法的进一步研究[M].北京:北京大学力学系,1989..
  • 3郭文章.节理岩体爆破过程数值模型及其试验研究[M].北京:中国矿业大学北京校区图书馆,1998..
  • 4刘承 苏先基.裂纹扩展速度对焦散线的影响和动态应力光学常数的测定[J].实验力学,1988,3(2):111-111.
  • 5杨仁树.岩石炮孔定向断裂控制爆破机理试验研究[M].北京:中国矿业大学(北京校区),1997.24.
  • 6杨永琦,朱振海,方文儒.光面爆破机理的试验研究[J]煤炭学报,1986(03).

共引文献70

同被引文献53

引证文献5

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部