摘要
高混凝土面板堆石坝沉降监测是土石坝关键技术之一,紫坪铺工程分20段安装埋设了56套沉降仪,仪器完好率高,观测数据完整。监测分析表明:沉降规律性好,坝料分区对坝体沉降影响小,截止到2005年6月底,最大沉降量为88.1cm,最大沉降量与坝高比为0.56%,坝体施工质量优良。
Settlement monitoring for high concrete faced rockfill dam is a key technology.Zipingpu dam is divided into 20 blocks in which 56 sets of settlement meters are embedded with complete observation data.Monitoring analysis shows that settlement is regular,effect of dam zoning on settlement is small.By the end of June,2005,the maximum settlement is 88.1cm,ratio of the maximum settlement to dam height is 0.56%.Construction quality of dam is excellent.
出处
《四川水力发电》
2006年第1期21-27,共7页
Sichuan Hydropower
关键词
紫坪铺
堆石坝
沉降监测
分析
施工期
Zipingpu Project
ockfill dam
settlement monitoring
analysis
construction period