摘要
本文以测试分析为基础介绍了重载车辆在驼峰溜放后对编组场既有减速顶布置带来的影响,并提出应对既有的调速设备和作业方式进行改造和改进来适应这一变化。
This Article base the testing analyse introduces to bring the influence of disposal retarders in marshalling yard after the track of over loading hump rolling, and it also put forward that we should adapt this new change to alteration and amelioration the existence speed control equitxnents and operation mode.
出处
《减速顶与调速技术》
2006年第1期1-6,共6页
Retarders & Speed Control Technology
关键词
驼峰
编组站
重载
调速
减速顶
hump
marshalling station
over loading
speed control
retarder