摘要
通过对柘荣龙溪三级水电站升压站边坡的防护治理实践,阐述了喷锚挂网结合预应力锚索的施工工艺流程和治理效果,对今后类似的工程具有借鉴意义。
The paper presents the process of governing the side slopes of a booster station in the Youxi three-step hydropower station of Zherong County and introduces the slope-side control results and a working technical process of rockbolts and shotcrete supporting cotnbined with a prestressed cable. The technique of controlling a slope-side can use for reference by a similar engineering project.
出处
《福建地质》
2006年第1期39-42,共4页
Geology of Fujian
关键词
边坡
喷锚挂网
预应力锚索
施工工艺
防护治理
柘荣龙溪
side slope, rockbolts and shotcrete supporting, prestressed cable, working technology, controlling and protection, Zherong County, Fujian Province