摘要
本文介绍了神东公司上湾煤矿综采工作面生产情况,统计了工作面的进刀、割煤、跑空刀时间,计算了工作面开机率并对如何提高开机率进行简单分析。对于其它综采面如何提高开机率、产量及效率有一定的参考和借鉴。
This article introduces the producing situation on the working face of mining integration in Shang Wan Coal Mine of Shen Dong Company, adds up the time of running reamers, reaming coal and operating the reamers in vain on the working face, calculates the rate of running machines on the working face and gives a simple analysis of how to improve the rate. It prorides reference for other working faces of mining integration on how to improve the rate of running machines, production and efficiency.
出处
《华北科技学院学报》
2006年第1期22-24,共3页
Journal of North China Institute of Science and Technology
关键词
综采工作面
开机率
进刀
割煤
跑空刀
the working face of mining integration
the rate of running machines
running reamers
reaming coal
operating the reamers in vain