摘要
针对桥面铺装施工中遇到的问题,从测量精度和施工工艺两方面进行论述,提出了测量方案设计和TQC方法中PDCA循环的过程控制,在桥面铺装施工中进行实际运用,达到了预期目的,解决了桥面施工中普遍存在的问题。
According to the problems encountered in bridge deck pavement construction process discussion is made from two aspects: measurement accuracy and construction technology; at the same time cvorresponding design scheme for measurement and process control of PDCA cycle in TQC method are proposed. Application acquires anticipated effect, which efficiently resolves the problems encountered.
出处
《山西建筑》
2006年第8期304-305,共2页
Shanxi Architecture
关键词
桥面铺装
标高
测量方案
PDCA循环
bridge deck pavement, level, measurement scheme, PDCA cycle