摘要
针对石太客运专线桥隧相连工况,分析隧道口架设简支双线整孔箱粱的各种方法及适用条件,提出可在双线隧道口架设整孔箱梁的900t级架桥机设计方案。
According to the conditions of bridge-tunnel joint work in Shijiazhuang-Taiyuan railway the methods erection simple supported double railway line box girder and their applied conditions are introduced. The design scheme of 900t bridge girder erection machine is proposed.
出处
《山西建筑》
2006年第8期329-330,共2页
Shanxi Architecture
关键词
双线箱梁
架桥机
隧道口
控制系统
double railway line box girder, bridge girder erection machine, tunnel face, control system