摘要
本文介绍利用原有跨江耐张段铁塔换线改造的设计方法,为类似工程设计时就如何解决路径困难、减少施工停电时间和降低工程造价提供参考。
This paper is for introducing a method of reconstruction (restringing) design using the old strain towers that cross over river. It could give a reference for similar project designs to solve path difficulties, to reduce power cut hours in construction period and to save project cost.
出处
《广东输电与变电技术》
2006年第2期31-33,共3页
Guangdong Power Transmission Technology
关键词
路径困难
旧塔换线改造
减少施工停电时间
Path difficulties
Existent tower reconstruction (restringing)
Reducing power cut hours in construction period