1Nembhard H B.Simulation Using the State-space Representation of Noisy Dynamic Systems to Determine Effective Integrated Process Control Design[J].Institute of Industrial Engineers Transactions,1998,30 (3):247 ~ 256.
2Janakiram M.Statistical and Engineering Process Control Integration Strategies for Constrained Controllers[D].Arizona State University,2001.
3Hopp W J.Setting WIP Levels with Statistical ThroughputControl(STC)in CONWIP Production Lines[J].Interna-tional Journal of Production Research,1998,36(4):867-882.
4Zhao X B.A semi-open decomposition approach for an openqueueing network in a general configuration with a kanbanblocking mechanism[J].International Journal of ProductionEconomics,1999,60-61:375-380.
5Zhao X B,Nakashima K.An optimal part sending policy fora production system in a general configuration with a newcontrol strategy[J].Systems and Humans,2000,30(2):521-527.
6Papadopoulos H T,Vidalis M I.Minimizing WIP inventoryin reliable production lines[J].Production Economics,2001,70(2):185-197.
7Lin Yu-hsin,Lee Ching-en.A total standard WIP estimationmethod for wafer fabrication[J].European Journal of Opera-tional Research,2001,131(1):78-94.
8Leachman R C,Kang J.Short cycle time and low inventoryin manufacturing at samsung electronics[J].Interfaces,2002,32(1):61-77.
9Lodding H,Yu K W,Wiendahl H P.Decentralized WIP-o-riented manufacturing control(DEWIP)[J].ProductionPlanning&Control,2003,14(1):42-54.
10Yavuz A,Bozer.Expected waiting times at loading stationsin discrete-space closed-loop conveyors[J].Operational Re-search,2004,155(2):516-532.