摘要
旨在通过金堆城钼业公司露天矿动态地质模型系统的开发实践总结,结合现代计算机CAD的应用技术,对露天矿生产辅助设计提出可行程序,为数字矿山打下基础。
Based on the software development of the open-pit mine dynamic geological model for Jinduicheng Molybdenum Industry Co. and in combination with modern computer CAD application technology, a feasible program of the auxiliary design for the open-pit mine production was compiled, which aims to lay a foundation for a digital mine.
出处
《金属矿山》
CAS
北大核心
2006年第4期43-44,共2页
Metal Mine
关键词
动态地质模型
生产辅助设计
AUTO
CAD二次开发应用
Dynamic geological model, Auxiliary design for production, Secondary development and application of Auto CAD