期刊文献+

某中学运动场预应力束连接器事故处理及结构荷载试验

THE TREATMENT OF PRESTRESS TIGHTWIRE COUPLER FAILURE AND STRUCTURAL LOADING TEST IN AN ATHLETIC FIELD OF A HIGH SCHOOL
下载PDF
导出
摘要 简要介绍了某中学运动场预应力施工中钢绞线连接器发生失效的情况,对事故产生的原因进行了分析,提出了无粘结预应力搭接加固处理方案,并成功地进行了实施。通过大型现场荷载试验,对采用连接器的超长预应力次粱结构的使用性能及连接器的可靠性进行了检验。 It is presented briefly that the failure of a steel strand coupler during the tension of the prestressed tendon in a high school. As a result of the analysis of its reasons, the scheme adopting overlapping unbonded prestressed tendon for the reinforcement is proposed and successfully accomplished. And the data on the site test substantiates the efficiency of the steel strand coupler and the performance of the ultra long prestressed secondary girder structural system, which adopts steel strand couplers.
出处 《工业建筑》 CSCD 北大核心 2006年第3期102-104,107,共4页 Industrial Construction
关键词 预应力次梁结构体系 钢绞线连接器 预应力搭接加固 荷载试验 prestressed secondary girder structural system steel strand coupler overlapping tendon reinforcement loading test
  • 相关文献

参考文献3

二级参考文献5

  • 1王正霖 邓朝荣 等.单跨多层装配整体预应力框架结构的研究[J].工业建筑,1984,(6).
  • 2-.预应力工程实例应用手册(房屋建筑篇),其中的5、6、14、23工程实例[M].北京:中国建筑工业出版社,1994..
  • 3王正霖,建筑结构学报,1986年,5期
  • 4王正霖,工业建筑,1984年,6期
  • 5李唐宁,唐祖全,罗建兵,何洪建.大跨预应力次梁楼盖结构体系经济性分析[J].建筑结构,1998,28(3):3-6. 被引量:11

共引文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部