期刊文献+

面向生产指标优化的选矿过程调度研究 被引量:10

Study of scheduling based on production indices optimization for mineral processing
下载PDF
导出
摘要 针对选矿厂生产调度过程,本文提出了一种面向生产指标优化的选矿过程调度方法,该方法在保证精矿品位的前提下,尽量减少精矿库存,最大限度地利用设备能力.讨论了基于该方法的选矿生产调度系统的结构、功能和优化策略.采用该方法的调度系统的功能除了具备普通的调度系统的设备运行调度和资源调度功能外,还包括生产指标的优化,即以生产指标、工艺指标逐层分解和设定,逐层优化控制的思想,实现了管理和控制一体化.该系统运用于某钢铁公司选矿生产,提高了生产效率.该系统的成功实施为流程行业大系统的总体优化调度开拓了一个新方法,新思路. Aiming at the production scheduling of minerals processing plant, a scheduling method based on production indices optimization for minerals processing is presented. On the basis of ensuring the tenor of finished ore, the method makes the best of reducing finished ores inventory and utilizing facilities. Structure, function and optimal policy of production scheduling system of minerals processing are discussed. By adopting this method, the scheduling system is provided with not only general facilities running and resources scheduling, but also optimization of production indices. That is to analyze production indices and technologic indices, then to realize optimal control step by step and finally to realize the integration of management and control. This system has been applied to the minerals processing plant of an iron and steel company and the production efficiency is increased. The successful implementation of this system has explored a new method for the overall optimization scheduling of the large systems in the process industry.
出处 《系统工程学报》 CSCD 北大核心 2006年第2期136-142,共7页 Journal of Systems Engineering
基金 国家重点基础研究发展计划(973)资助项目(2002CB312201) 国家自然科学基金重点资助项目(60534010) 国家创新研究群体科学基金资助项目(60521003) 长江学者和创新团队发展计划资助项目(IRT0421)
关键词 选矿过程 综合生产指标 生产计划 生产调度 mineral processing comprehensive pruduction indices pruduction planning production scheduling
  • 相关文献

参考文献7

二级参考文献42

  • 1杨文福.计算机集成制造系统(CIMS)──工厂自动化的发展方向[J].基础自动化,1995,2(4):1-4. 被引量:1
  • 2[1]Nagalingam S V, Lin G C I. Lastest developments in CIM [J]. Robotics and Computer Integrated Manufacturing, 1999, (15) :423-430.
  • 3[2]Bruce M Rishardson. Back to the Future: MES from 1999-2000[R]. AMR Inc,1995.
  • 4[4]Sohlenius G. Concurrent engineering[J]. Annals of CIRP, 1992 , 41(2): 645-655.
  • 5[5]Kusiak A, Larson T N. Reengineering of design and manufacturing processes [J]. Computers Engineering,1994, 26(1): 521-536.
  • 6[6]Garey M R, Graham R L, Johnson D S. Performance quarantees for scheduling algorthms [J]. Operations Research, 1978,26(1): 3-21.
  • 7[7]Gonzalez T, Sahni S. Flowshop and jobshop schedules: Complexity and approximation [J]. Operations Research, 1978,26 (1): 36-52.
  • 8[8]Jay Liebowitz, William E Potter. Scheduling objective,requirements, resources, constraints, and Process:Implications for a generic expert scheduling system architecture and toolkit [J]. Expert Systems with Applications, 1995, 9(3):423-432.
  • 9[9]Everett J E. Iron ore production scheduling to improve product quality [J]. European J of Operational Research, 2001,129 (2): 355-361.
  • 10[10]Speranza M G, Ukovich W. Applying an optimization model to production management and logistics [J].CIMS, 1992,3(8): 239-244.

共引文献154

同被引文献74

引证文献10

二级引证文献45

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部