摘要
通过某市雷达塔工程基坑开挖和地下室施工过程的基坑围护结构体系的施工,介绍了土钉墙围护结构的施工工艺流程、质量控制。
This article introduces the constructing technical process and the quality control of the soil nailing surrounding protection structure through the construction of the pit protection structure system in the excavation and the basement construction process of a radar tower project in a city.
出处
《丽水学院学报》
2006年第2期43-45,共3页
Journal of Lishui University
关键词
基坑支护
土钉墙
施工方法
excavation support structure
soil nailing
constructing methods