期刊文献+

露天与地下联合开采安全隔层厚度研究 被引量:13

Research on the Thickness of Safe Partition Pillar for Combined Underground and Opencast Mining
下载PDF
导出
摘要 针对三道庄矿采矿方式,分别用有限元数值模拟和简化梁法等方法计算得出了不同采空区跨度所要求的安全隔层厚度,综合确定了河南栾川三道庄钼矿露天与地下联合开采的合理隔层厚度。 In view of the combined open - pit and underground mining in Sandaozhuang molybdenum mine, Henan province, the needed thicknesses of safe partition pillar for the different spans of goal were calculated out respectively using finite element simulation and beam theory of structural mechanics, and the reasonable thickness of safe partition pillar for the combined open - pit and underground mining in this mine was determined also.
出处 《矿业研究与开发》 CAS 北大核心 2006年第2期20-21,共2页 Mining Research and Development
关键词 露天与地下联合开采 安全隔层厚度 数值模拟 Combined underground and opencast mining,Thickness of safe partition pillar, Numerical simulation
  • 相关文献

参考文献1

  • 1陈湘才,郭昌寰,胡增强.固体力学基础[M].南京:东南大学出版社,1990.

共引文献1

同被引文献89

引证文献13

二级引证文献110

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部