摘要
分析现场施工条件,利用混凝土叠合结构原理,将整体现浇梁改为叠合结构施工,大大减小了施工难度,提高了施工效率,经济效益显著,值得借鉴。
Through analyzing the condition of construction filed, and by using the principle of laminated concrete structures, monolithic cast-in-place girdle construction was changed to laminated structure construction. By this alteration, not only the construction difficulty is decreased and the construction efficiency raised, but also notable economic benefit is brought, serving as a reference for future construction.
出处
《水运工程》
北大核心
2006年第4期82-84,共3页
Port & Waterway Engineering
关键词
混凝土
叠合结构
施工
应用
concrete
laminated structure
construction
application