期刊文献+

大规模并行计算机作业调度评价 被引量:3

Evaluation of Massive Parallel Computer Job Scheduling
下载PDF
导出
摘要 大规模并行计算机的作业调度直接关系到其计算能力的发挥,因而相应的研究具有十分重要的意义。论文通过对国外现有作业调度评价体系的研究,建立了更能反映并行作业特点的作业调度策略评价体系,在此基础上设计并实现了一个作业模拟调度环境。模拟调度环境采用事件驱动的工作模式,支持FCFS、大作业优先、小作业优先、长作业优先、短作业优先、GANG等调度策略。模拟测试结果表明,GANG调度策略优于所有测试的空间共享调度策略;同时在空间共享调度策略中,短作业优先策略和大作业优先策略具有较好的性能。 Since parallel job scheduling in Super-computer was gained recognition as important topic,much research on scheduling strategy and performance evaluation has been done but it is still difficult to choose the most efficient strategy for a given computing environment.In this paper,we improve the existed metrics of parallel job scheduling and implement a simulated environment for job scheduling.The simulating environment supports both space-sharing strategy such as FCFS and time-sharing strategy.In order to present the results of the empirical study of strategy other than the conceptual result,we construct real workload derived from the supercomputer job logs for the environment.Our experimental results demonstrate that GANG scheduler can be more effective than almost all space-sharing strategy especially when the environment has heavy load.The short run-time job first and the big job first strategy can be effective among all space-sharing strategy.
出处 《计算机工程与应用》 CSCD 北大核心 2006年第10期79-83,共5页 Computer Engineering and Applications
关键词 大规模并行计算机 作业调度 调度评价 massive parallel computer,job scheduling,evaluation of strategy
  • 相关文献

参考文献6

  • 1Dror G Feitelson.The forgotten factor:Facts;on performance evaluation and its dependence on workloads[C].In:Burkhard Monien,Rainer Feldmann ed.Euro-Par 2002 Parallel Processing,Springer-Verlag,Lect Notes Comput Sci,2002;2400:49~60
  • 2Dror G Feitelson,Larry Rudolph.Metrics and benchmarking for parallel job scheduling[C].In:Dror G Feitelson,Larry Rudolph ed.Job Scheduling Strategies for Parallel Processing,Springer-Verlag,Lect Notes Comput Sci,1998; 1459:1~24
  • 3H Franke,J Jann,J Moreira et al.An Evalu-ation of Parallel Job Scheduling for ASCI Blue-Pacic[C].In:Proceedings of SC'99,Portland,Oregon,ACM Press and IEEE Computer Society Press,1999:11 ~ 18
  • 4E Krevat,J Castanos,J Moreira.Job scheduling for the Blue Gene/L system[C].In:Job Scheduling Strategies for Parallel Processing,Lecture Notes in Computer Science,Springer,2002:38~54
  • 5Eitan Frachtenberg,Fabrizio Petrini,Juan Fernandez et al.Scalable Resource Management in High-Performance Computers[C].In:Proceedings of the IEEE International Conference on Cluster Computing Cluster'02,Chicago,IL,2002
  • 6Kris Gaj,Tarek E1-Ghazawi,Nikitas Alexandridis et al.Performance Evaluation of Selected Job Management Systems[C].In:Workshop on Performance Modeling,Evaluation,and Optimization of Parallel and Distributed Systems,PMEO 2002,Fort Lauderdale,Florida,2002

同被引文献19

  • 1阳东升,张维明,刘忠,鲁音隆.战役任务计划的数学描述与求解算法研究[J].系统工程理论与实践,2006,26(1):26-34. 被引量:32
  • 2赵宗弟,胡凯,胡建平.基于PBS的集群作业调度策略的设计与实现[J].计算机与数字工程,2006,34(11):123-127. 被引量:9
  • 3PARK C,KLEINMAN D L,PATHPATI K R. Holonic sched- uling concepts for C^2 organizational design for MHQ with MOC[C]//The 13th ICCRTS:C2 for Complex Endeavors, 2008,June 17-19, Bellevue,WA.
  • 4LEVCHUK G M, LEVCHUK Y N, LUO J, et al. Normative design of organizations-partI : Mission planning [ J ]. IEEE Transactions on Systems, Man, and Cybernetics-Part A : Systems and Humans,2002,32 (3) :346-359.
  • 5LEVCHUK G M, LEVCHUK Y N, LUO J, et al. Norma- tive design of organizations-PartII : Organizational structure [ J ]. IEEE Transactions on Systems, Man, and Cybernet- ics-Part A : Systems and Humans,2002,32 (3) :360-375.
  • 6YU F L, TU F, PATHPATI K R. A novel congruent organ- izational design methodology using group technology and a nested genetic algorithm [ J ]. IEEE Transactions on Sys- tems, Man, and Cybernetics-Part A: Systems and Humans, 2006,36(1) :5-18.
  • 7YU F L, TU F, PATTIPATI K R. Integration of a holonic organizational control architecture and muhiobjective evo- lutionary algorithm for flexible distributed scheduling[ J]. IEEE Transactions on Systems, Man, and Cybernetics-Part A : Systems and Humans, 2008,38 (5) : 1001-1017.
  • 8RAVINDRAN K. Task allocation and scheduling of con- current applications to multiprocessor systems [ D ]. Berke- ley:Electrical Engineering and Computer Sciences Univer- sity of California at Berkeley,2007.
  • 9LEVCHUK G M, LEVCHUK Y N, MEIRINA C, et al. Normative design of project-based organizations-Part III: Modeling congruent, robust, and adaptive organizations [ J ]. IEEE Transactions on Systems, Man, and Cybernet- ics-Part A:Systems and Humans,2004,34(3) :332-350.
  • 10栾翠菊,宋广华,郑耀,张继发.一种网格并行任务执行时间预测算法[J].计算机集成制造系统,2007,13(9):1805-1810. 被引量:4

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部