采用二维弹性、弹塑性数值计算方法,对Ⅲ-Ⅴ级围岩条件下平行布设的双洞隧道中夹岩墙受力、变形特点随隧道间距变化的情况进行了研究。研究表明,对于两隧道间距较小的小净距隧道,中夹岩墙的受力、变形极为不利,是设计、施工和监控量测的关键部位。同时,研究了不同隧道埋深以及不同岩柱加固措施对小净距隧道中夹岩墙受力、变形特点的影响,为小净距隧道的支护设计、开挖方式选取、岩墙加固方式选取以及现场监控量测方案制定等提供参考。
Applying 2D elastoplastlc numerical calculation method and under the conditions of surrounding rock from Grade Ⅲ to Ⅴ , it is studied that the characteristics of stress and deformation of middle rock wall in paralleUy laid twin tunnel, The research show that stress and deformation of middle rock wall are adverse to parallel tunnel with smaller interval and these locations are very critical for design, construction and monitoring measurements. At the same time, it is also studied that the effects of different buried depth and different reinforcing measures of rock wall on stress and deformation of the tunnels with small interval, which provides guidance to design of support, selection of excavation method, reinforcing method of rock wall and monitoring plans.
出处
《工业建筑》
CSCD
北大核心
2006年第4期57-60,84,共5页
Industrial Construction
关键词
隧道
小净距
中夹岩墙
力学行为
加固措施
tunnel small interval middle rock wall mechanical behavior reinforcing measures