摘要
变电站视频监控系统更新换代后,新系统与旧系统的云台和球机如何控制?文中详述双方协议的转换,协议转换器的开发及多机通信的原理。
This article introduces that after the Video Monitor System of power station was updated, the process and the theory of developing the potocol- translator and decoding the potocols of both the old system and the new one. Finally the new system can be able to control the Pan/Tilt and Sphere- Machine of the old system.
出处
《河南电力》
2006年第1期14-15,共2页
Henan Electric Power
关键词
视频监控系统
协议转换器
变电站
video monitor, decoder - device, potocol - translation