崇文门站顶管预支护方案三维有限元分析 被引量:1

Analysis of Scheme on Technical of Pipe-Jacking Pre-Support in Chongwenmen Subway Station with Three-Dimensional Finite Element
下载PDF
导出
摘要 北京地铁五号线崇文门站,下穿既有地铁一号线区间隧道,车站顶板与区间隧道底板间距2.858 m.为了严格控制既有环线区间隧道的沉降,确保环线地铁运营安全,首次采用了顶管作超前预支护.考虑不同的顶管直径以及周围地层的弹性模量对地表、拱顶和既有线的变形影响,用3D_Sigma三维有限元软件进行施工效应的计算模拟,掌握顶管预支护洞室的力学效应,预测车站施工引起既有隧道的沉降量.计算表明用大刚度的顶管作超前预支护,可以满足既有线地铁运营和城市地表建筑物变形控制要求. Chongwenmen Station of No. 5 line of Beijing subway goes beneath the existing No. 1 line of the interval tunnel of Beijing subway. The distance between the roof of the station and the bottom board of the interval tunnel is 2. 858 m. In order to control the subsidence of the interval tunnel and guarantee the safety of operation strictly, pipe-jacking is used as pre-support for the first time. Threedimensional finite element software, 3D-Sigma, is used to calculate and simulate the construction effect. The mechanical effect of the hole room with pipe-jacking pre support is grasped well in this paper. In addition, the subsidence of the interval tunnel because of the construction of the station is forecasted. The computation indicated that pipe-jacking being used as pre-support can satisfy the request of distortion controlling for existing subways and city buildings.
出处 《北京交通大学学报》 EI CAS CSCD 北大核心 2006年第1期47-50,共4页 JOURNAL OF BEIJING JIAOTONG UNIVERSITY
关键词 顶管 预支护 三维有限元 施工效应 pipe-jacking pre-support three-dimensional finite element construction effect
  • 相关文献

参考文献5

二级参考文献17

  • 1铁道部.铁路桥涵技术规范[M].北京:中国铁道出版社,1995..
  • 2方从启.基于半解析元法研究顶管施工引起的地层运动[M].上海:同济大学,1998..
  • 3铁道部科学研究院铁道建筑研究所.既有线路基土的性质[M].北京:铁道部科学研究院,1995..
  • 4铁道部第一勘测设计院.铁路工程设计技术手册-路基[M].北京:中国铁道出版社,1995..
  • 5ANSYS公司.ANSYS非线性分析指南[M].北京:美国ANSYS公司北京办事处,1998..
  • 6朱维申,复杂条件下围岩稳定性与岩体动态施工力学,1996年
  • 7姜彦忠,爆破技术基础,1994年,197页
  • 8孟吉复,爆破测试技术,1990年,94页
  • 9俞裕泰,岩石力学与工程学报,1987年,6卷,1期,147页
  • 10杨桂通,弹塑性力学,1980年,276页

共引文献159

同被引文献5

  • 1PECK R B. Deep excavations and tunneling in soft ground [ C ]// Proceeding of 7th International Conference on Soil Mechanics andFoundation Engineering. Mexico City: State of the Art Report, 1969:225 - 290.
  • 2BOBET A. Analytical solutions for shallow tunnels in saturated ground [J]. Journal of Engineering Meehanies,2001, 127 ( 12 ) : 1258 - 1266.
  • 3PARK K H. Elastic solution for tunneling -indueed ground move- ments in clays[J]. International Journal of Georneehanies,2004, 4(4) :310 -318.
  • 4时亚昕,陶德敬,王明年.大断面浅埋暗挖隧道施工引起的地表移动及变形预测[J].岩土力学,2008,29(2):465-469. 被引量:42
  • 5钱七虎.迎接我国城市地下空间开发高潮[J].岩土工程学报,1998,20(1):112-113. 被引量:198

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部