摘要
阐述了原油罐区增容改造项目的爆破过程,对在复杂建设环境下进行爆破作业和地基处理提出了可行的解决方案。
In this article, author expatiates blasting process of old oil tank region add capacity project. Author also put forward some feasible solution methods to blast and treat basement on the complicated construction environment.
出处
《施工技术》
CAS
北大核心
2006年第4期84-86,共3页
Construction Technology
关键词
爆破
振动监测
地基处理
强夯
blast
vibration monitoring
basement treatment
ramming