摘要
以漳山发电300MW直接空冷机组ACC系统在冬季成功运行为例,介绍了ACC系统在寒冷冬季运行时容易发生的问题以及采取的措施。
300 MW generating sets with ACC are operating successfully in winter in Shanxi Zhangshan Electric Power Co. Ltd., based on this example, some frequently occurred problems of ACC and countermeasures taken were introduced.
出处
《华北电力技术》
CAS
2006年第A01期40-42,共3页
North China Electric Power