通过对电网黑启动的理论分析,结合内蒙古电网在薛家湾地区进行的黑启动实验,分析了内蒙古电网黑启动存在的问题及可能采用的多个黑启动方案,并且对实施黑启动方案进行了评估,得出建立电网紧急保电预案,确保电网不出现“全黑”情况,才是保证电网安全稳定运行的关键。
Considering the black startup test in Xuejiawan area in Inner Mongolia Power Grid and theoretical analysis,the problems and several black startup options were analyzed and evaluation was made on the black startup options. A conclusion was made that emergency plan for power supply must be made to prevent blackout of power grid. This is essential to safe and stable operation of power grid.
出处
《华北电力技术》
CAS
2006年第4期7-9,19,共4页
North China Electric Power
关键词
黑启动试验
评估
不全黑
预案
black startup test
evaluation
partial blackout
emergency plan