内蒙古电网黑启动试验研究与评估 被引量:1

Research and Evaluation of Black Startup Test in Inner Mongolia Power Grid
下载PDF
导出
摘要 通过对电网黑启动的理论分析,结合内蒙古电网在薛家湾地区进行的黑启动实验,分析了内蒙古电网黑启动存在的问题及可能采用的多个黑启动方案,并且对实施黑启动方案进行了评估,得出建立电网紧急保电预案,确保电网不出现“全黑”情况,才是保证电网安全稳定运行的关键。 Considering the black startup test in Xuejiawan area in Inner Mongolia Power Grid and theoretical analysis,the problems and several black startup options were analyzed and evaluation was made on the black startup options. A conclusion was made that emergency plan for power supply must be made to prevent blackout of power grid. This is essential to safe and stable operation of power grid.
出处 《华北电力技术》 CAS 2006年第4期7-9,19,共4页 North China Electric Power
关键词 黑启动试验 评估 不全黑 预案 black startup test evaluation partial blackout emergency plan
  • 相关文献

参考文献2

二级参考文献8

  • 1ANCOMA J J. A framework for power system restoration following a major power failure [ J ]. IEEE Transactions on Power System, 1995,10(3):1480-1485.
  • 2ADIBI M M, MILANICZ D P. Protective system issues during restoration [ J ]. IEEE Transactions on Power System, 1995,10 ( 3 ):1492-1497.
  • 3昆德.电力系统稳定与控制[M].北京:中国电力出版社,2001..
  • 4North American Electric Reliability. Electric system restoration a reference document [R]. 1993.
  • 5ADIBI M, CLELLAND P, FINK L, et al. Power system restoration-a task force report [ J ]. IEEE Transactions on Power System, 1987,2 (2):271-277.
  • 6王维俭.电气主设备继电保护原理与应用[M].北京:中国电力出版社,2001..
  • 7房鑫炎,郁惟镛,熊惠敏,曾兆祺,丁民丞,郭佳田,高其蕙.电力系统黑启动的研究[J].中国电力,2000,33(1):40-43. 被引量:84
  • 8周云海,闵勇,林姿峰,孙果夫,郭雷,宋永华,孙锦鑫.吉林电网黑启动方案的制定及仿真[J].中国电力,2002,35(4):28-31. 被引量:10

共引文献15

同被引文献14

  • 1何开荣,陈祖勋.茂名地区电网黑启动的探讨[J].高电压技术,2004,30(7):67-68. 被引量:1
  • 2袁志坚,孙才新,李爱华,李剑,廖瑞金.模糊多属性决策方法评价变压器状态维修策略[J].高电压技术,2004,30(8):33-35. 被引量:19
  • 3李继红,倪秋龙,金啸虎.浙江电网黑启动方案编制研究[J].华东电力,2006,34(1):26-29. 被引量:12
  • 4Adibi M M,Borkoski J N,Kafka R J.Analytical tool requirements for power system restoration[J].IEEE Trans on Power Systems,1994,9(3):1582-1591.
  • 5Kojima Y,Warashina S,Nakamura S.Development of a guidance method for power system restoration[J].IEEE Trans on Power Systems,1989,4(3):1219-1227.
  • 6Lindstorm R R.Simulation and field test of the black start of a large coal-field generating station utilizing small remote hydro generation[J].IEEE Trans on PWRS,1990,5(1):162-168.
  • 7Adibi M M,Borkoski J N,Kafka R J.Power system restoration:the second task force report[J].IEEE Trans on Power Systems,1987,2(2):927-933.
  • 8Chen-ching Liu,Kan-Lee Liou,Ron F Chu,et al.Generation capability dispatch for Bulk power system restoration:a knowledge-based approach[J].IEEE Trans on Power System,1993,8(1):316-325.
  • 9Young-Moon Park,Kwang-Ho Lee.Application of expert system to power system restoration in sub-control center[J].IEEE Trans on Power Systems,1997,12(2):629-635.
  • 10江长明,闫贺群,许鹏.华北电网黑启动试验[J].电力系统自动化,2000,24(22):57-58. 被引量:22

引证文献1

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部