软土地铁盾构法隧道工程风险识别与应对 被引量:16

Risk identification and handling in the shield tunneling of metro in soft soil
下载PDF
导出
摘要 结合上海地铁7号线工程,提出以动态风险识别过程为主线、以静态风险识别为手段的风险识别方法,对地铁盾构法隧道工程建设的风险进行了识别。在风险识别的基础上,结合以往软土隧道工程建设的实践经验、数据资料以及隧道工程理论,重点研究了盾构法隧道工程实施过程中一些典型风险的应对措施。另外,对跨越黄浦江段隧道、联络通道等特殊工程的风险进行了详细的分析与研究。 Based on Shanghai metro M7 line project, a risk identification method is put forward which takes dynamic risk identification process as the mainstream and static risk identification as the tool. The method was applied to the risk identification for the above - mentioned project. On the basis of risk identification incorporating the practical experience in soft ground tunneling, available data and literatures as well as the tunnel engineering theories, risk handling measures for some typical risks in the process of shield tunneling are studied. In addition, the risks of Huangpu Rivercrossing tunnel and communication galleries between the up line tunnel and down line tunnel are analyzed in detail.
出处 《现代隧道技术》 EI 北大核心 2006年第2期10-14,共5页 Modern Tunnelling Technology
关键词 地铁隧道 盾构法 风险识别 应对措施 Metro tunnel Shield tunneling Risk identification Countermeasures
  • 相关文献

参考文献8

  • 1Einstein,H.H..Risk and risk analysis in rock engineering[J].Tunnelling and Underground Space Technology,1996,11 (2):141 ~ 155.
  • 2Sturk,R.,Olsson,L.and Johansson,J.Risk and decision analysis for large underground projects,as applied to the Stockholm ring road tuning[J].Tunnelling and Underground Space Technology,1996,11 (2):157 ~ 164.
  • 3Vik,E.A.,Sverdrup,L.,Kelley,A.etc.Experiences from environmental risk management of chemical grouting agents used during construction of the Romeriksporten tunnel[J].Tunnelling and Underground Space Technology,2000,15 (4):369 ~ 378.
  • 4Tonon,F.,Mammino,A.,Bernardini,A.Multiobjective optimization under uncertainty in tunneling:application to the design of tunnel support/reinforcement with case histories[J].Tunnelling and Underground Space Technology,2002,17:33 ~ 54.
  • 5Yoo,C.,Kim,J.H..A web -based tunneling-induced building/utility damages assessment system:TURISK[J].Tunnelling and Underground Space Technology,2003,18:497 ~ 511.
  • 6Eskesen,S.D.,Tengborg,P.,Kampann,J.,etc.Guidelines for tunnelling risk management:International Tunnelling Association,Working Group No.2[J].Tunnelling and Underground Space Technology,2004,19:217 ~237.
  • 7郭仲伟.风险分析与决策[M].北京:机械工业出版社,1986..
  • 8石礼安.地铁一号线工程[M].上海:上海科学技术出版社,1998.

共引文献34

同被引文献68

引证文献16

二级引证文献192

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部