摘要
结合杭州高新<滨江>水务有限公司一级污水处理厂直径为30m的沉井工程施工,对复杂地质情况下大直径沉井的下沉计算、模板拼装方法、浇筑分界点的确定及具体施工技术等做了详细介绍,为相关工程提供了借鉴。
According to the construction of the open caisson with diameter of 30 m in the primary sewage treatment plant of Hangzhou Hi-tech Binjiang Water Co. Ltd. , the sinkage calculation of largecaliber open caisson under complex geological conditions, the method of the mould installation, the determination of the pouring divide joint and the specific construction techniques were introduced in detail, which is used for reference for similar engineering.
出处
《中国给水排水》
CAS
CSCD
北大核心
2006年第8期98-100,共3页
China Water & Wastewater
关键词
排水
沉井工程
施工
drainage
open caisson engineering
construction