摘要
酒钢镜铁山铁矿地处高山寒冷山区.通风条件复杂,原设计的整体压入式大主扇通风系统没有正常运转。根据矿山具体条件.在新中段采用多级机站通风系统。本文着重介绍新系统的特点、多级机站的布置,并分析了矿山通风中存在的几个问题。
he ventilation condition of Jintieshan Iron Mine of Jiuquan Iron and Steel Company,which is located at high mountain and cold climate area,is very complicated. The integral forced ventilation system of large-sized main fan used in original design do not reach normal operation condition. According to the practical condition in this mine,the ventilation system of multiple fan stations is put forward at new level. In this paper,the characteristic of new ventilation system,the arrangement of multiple fan stations are presented emphatically,and the certain problems existed in mine ventilation systemare analysed.
出处
《金属矿山》
CAS
北大核心
1996年第4期42-44,共3页
Metal Mine
关键词
寒冷矿区
通风系统
多级机站
矿井通风
Mining district at high mountain and cold climate area, Ventilation system, Multiplefan stations