摘要
工程施工阶段的质量管理,应抓住事先指导,事中检查,事后验收三个环节。对重点部位、关键工序进行动态控制。对工程施工做到全过程、全方位的质量监控,从而有效的实现工程项目施工的全面质量控制。
The quality management of the engineering construction stage is divided into three links such as, guid, should be in advance, acception after check. The dynamic control to the main part and work are carried on controlling all - directions quality supervision so as to the engineering construction to control the overall quality of the engineering item effectively.