结合工程实例,从中线设计高程、行车道边缘设计高程,边线设计高程几个方面对用EXCEL编程计算路基横断面进行了论述。
Based on the practice, discussion is made on using Excel to calculate the subgrade transection, especially in elevation design in central line, walkway edge and sideline.
出处
《交通科技与经济》
2006年第1期51-52,62,共3页
Technology & Economy in Areas of Communications
关键词
辅道工程
横断面
设计高程EXCEL
auxiliary road engineering
transection
elevation design
Excel