摘要
根据亭下水库建库以来的工程管理实践和对22年(1983-2004)坝基扬压力监测资料的综合分析,绘制了扬压力过程线,对扬压力纵向和横向分布进行了分析,证明了亭下水库实测坝基扬压力小于设计值的论断。
Based on the project management experiences after the establishment of the reservoir and the 22 years' (1983-2004) comprehensive analysis of the dam foundation uplift pressure, and proved that the real dam foundation uplift pressure was less than the design data.
出处
《黄河水利职业技术学院学报》
2006年第2期21-23,共3页
Journal of Yellow River Conservancy Technical Institute
关键词
浙江
亭下水库
重力坝
扬压力
综合分析
zhejiang
tingxia reservoir
gravity dam
uplift pressure
comprehensive analysis