期刊文献+

南方互联电力系统中期动态稳定破坏事故数字仿真研究

A MID-TERM DYNAMIC INSTABILITY OF SOUTHERN CHINA INTERCONNECTED POWER SYSTEM──SIMULATION STUDY
下载PDF
导出
摘要 本文给出对我国南方互联电力系统1994年5月25日稳定破坏事故的时域动态仿真、特征值特征向量分析、电压稳定性分析及灵敏度分析的方法和结果,及在此基础上提出的应采取的措施及其效果。 This paper presents the simulation result of afailure in Southern China interconnected Power System happened on May 1994 causing a cascaded tripping of tie lines,generators and about 1730MW loads. The failure was triggered by a sudden tripping of a large 985MW Joint Venturenuclear power generation unit at the load center of Guangdong-Hongkong subsystem. Simulation includes time domain dynamics study, modal analysis, voltage stability andsensitivity analysis. The countermeasures and suggestionfor improvement based on simulation results are discussed.
出处 《电网技术》 EI CSCD 北大核心 1996年第8期55-60,共6页 Power System Technology
关键词 电力系统 中期动态稳定 数字仿真 Interconnected power system Mid-term dynamic stability Power system failure
  • 相关文献

参考文献2

  • 1刘肇旭,电网技术,1996年,20卷,7期
  • 2团体著者,1995年

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部