水布垭面板堆石坝主要施工技术综述 被引量:1

Review of the Main Construction Technology of Shuibuya CFRD
下载PDF
导出
摘要 清江水布垭水电站混凝土面板堆石坝最大坝高233 m,坝长660 m,大坝总填筑量为1 526万m3。为了减少河床覆盖层开挖量、节省投资,对其河床坝轴线上游40 m至下游155 m范围内的覆盖层进行了强夯处理,保留砂卵层10万m3,使直接工期提前1个月,为大坝安全度汛赢得了时间。施工中,采用挤压边墙、GPS,面板快速施工、防裂,铜止水连续成型机,剥肋滚压直螺纹连接等技术,改善了施工条件、提高了效率、保证了施工进度和质量、节省了投资。 The maximum height of the Shuibuy CFRD is 233 m with a crest length of 660m and the overall quantities of 1526ten thousand m^3.The layers are forced tamping from 40m of upper reachers of center line to 155m of lower reachers of center line for extacted quatities to cut down and investment to save.The quantities of the retained sand and gravel layers is 10ten thousahd m^3. And the time limit of straight line is a month to be advanced.The time is sufficient for dam's flood season to tide over. The construction condition is improved and the efficiency is raised and the course and the quality is ensured,and the investment is saved by the constrution technology of crushing side wall ,GPS ,face slab constructing speedy and providing against rift,Cu stopping water woking ,straight threed joining, etc.
出处 《水力发电》 北大核心 2006年第4期4-5,共2页 Water Power
关键词 面板堆石坝 碾压混凝土 施工技术 水布垭水电站 CFRD RCC construction technology Shuibuya Hydropower Station
  • 相关文献

参考文献4

二级参考文献5

  • 1DL/T5128-2001.混凝土面板堆石坝施工规范[S].[S].中华人民共和国国家经济贸易委员会,..
  • 2杨双成.混凝土面板堆石坝施工中几个问题的商榷[J].面板堆石坝工程,2002,(1).
  • 3J.B.库克.混凝土面板堆石坝的趾板[A]..混凝土面板堆石坝国际研讨会论文集[C].北京,2000.18-24.
  • 4肖化文,周忠兰.混凝土面板坝趾板体型设计[J].人民长江,2004,35(1):10-12. 被引量:6
  • 5肖化文,刘世选.对趾板分缝问题的探讨[J].西北水力发电,2003,19(4):23-25. 被引量:2

共引文献12

同被引文献11

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部